On May 15th Dave Wood visited a contractor in Miami Florida to consult on a large hangar project that required a rough grind to remove failing epoxy coating. The contractor eventually used his 4430 to remove the epoxy at a rate of 2,000SF per hour. Also visited were a couple of job and potential jobs where concrete polishing samples had been provided.