On January 7th Josh Jones visited a contractor in Florida. The project is a multipurpose facility that sees about 7,000 people and multiple fork-lift traffic every week. Some of the pictures show the completed floor after three weeks of heavy use, and other than being dirty, its still looking good.
The purpose of the trip was to refine
the process to meet a tight schedule.
The process we came up with was aggressive removal of the epoxy coating, two wet grinds and 4 polishing steps. |